Concrete Pump Pipeline
Producto

DN125 R225 90° 70MnMo

DN125 R225  90°  70MnMo
Twin wall bend pipe performance comprehensive description
Name Specifica
tion
Structure Material Weight(KG) Manufacture
process
Dimension and degree tolerance Pressure Weld tensile strength Surface coating
Twin wall bend pipe DN125 R225 90° Compound structure 70MnMo+
ST52
13.4 Pushed/quenched/automatic welding <1mm
<1°
160bar >580bar Baking paint

Lifetime(Conventional working environment):740Working Hours( The average data from the survey of 100 customers in 26 countries)

Application:Generally used for KYOKUTO/IHI/ZOOM concrete boom pump

Copyright © 2014 Hebei Runhong Fabricación de Maquinaria de Construcción (Tubería) S.L.
Todos los derechos reservados.